• Home
  • About Us
  • Services
    • Precast House Foundations
    • Precast Concrete Driven Piling
    • Mini-Piling & Underpinning
    • Restricted Access Piling
    • Steel Piling
  • Projects
  • Resources
  • Contact
  • Home
  • About Us
  • Services
    • Precast House Foundations
    • Precast Concrete Driven Piling
    • Mini-Piling & Underpinning
    • Restricted Access Piling
    • Steel Piling
  • Projects
  • Resources
  • Contact
  • Home
  • About Us
  • Services
    • Precast House Foundations
    • Precast Concrete Driven Piling
    • Mini-Piling & Underpinning
    • Restricted Access Piling
    • Steel Piling
  • Projects
  • Resources
  • Contact
PROJECT:

Mariners Way Housing Development

Design, supply and install over 1000nr 200mm sq. precast driven piles including pile trimming & pile testing, in addition to casting insitu pile caps and installing precast ground beams.

All Projects

Baldoyle Community Centre L

Baldoyle Community Centre

South West Gate L

South West Gate

Greystones Marina Village L

Greystones Marina Village

Westport Coast Guard Station L

Westport Coast Guard Station

Connacht Rugby Stadium – 36m High Light Towers L

Connacht Rugby Stadium – 36m High Light Towers

The Paddocks L

The Paddocks

Cloncreen Wind Farm L

Cloncreen Wind Farm

New Lidl Store L

New Lidl Store

Student Accommodation L

Student Accommodation

Notre-Dame Des Missions L

Notre-Dame Des Missions

  • Home
  • About Us
  • Projects
  • Resources
  • Contact
  • Precast House Foundations
  • Precast Concrete Driven Piling
  • Mini-Piling & Underpinning
  • Restricted Access Piling
  • Steel Piling
  • Privacy Policy
  • Cookie Policy

Terradrive
1 Tullow Road
Carlow
Co. Carlow
R93 E0F4
Ireland



+353 (0)59 916 4419



mail@terradrive.ie

© 2026Terradrive Ltd | Built by Yourweb.
×

Pile Cutting & Trimming

F012
Pile cutting and trimming, to expose the reinforcement for incorporation into the pile cap, is a process in the construction sequence that, at best is not given sufficient thought and more commonly is often ignored and treated with no regard. The fact is that it is one of the most important stages in the construction of the foundations as it will dictate whether there is a proper interface between the foundation piles and the superstructure. Improper treatment of piles during the breaking down process can result in serious structural defects to the pile and/or excessive settlements of the superstructure due to a substandard interface between the pile and the foundations.
request information sheet $
×

Piling in Brownfield Sites

F011
Development of Brownfield site is becoming more commonplace due to the increased scarcity of suitable development land. In most cases, these developments require piling and/or deep foundations, due to the unsuitable nature of near surface material to conventional foundation methods (ie: low bearing capacity values or unsuitable for excavation and removal from site).
request information sheet $
×

Vibration Associated with Driven Piling

F010
Vibration associated with Driven Piling is dependent on several factors inlcuding the size of hammer and drop height, the pile size and type (Precast Concrete, Steel Tube, Steel Section, Timber), the Pile load, the Ground conditions, and site layout. Ground vibration is generally measured in three orthogonal directions by means of accelerometers in the vertical, transverse and longitudinal directions. The Peak Particle Velocity is taken as the vector sum of these three direct components. The unit used for the PPV is millimetres per second. It is important at the outset of a piling contract, where there may be a risk due to vibration, that clear guidelines are established between all parties concerned.
request information sheet $
×

Preparing your Site for Piling

F009
Site preparation may vary according to the type of piling to be carried out, the equipment used and the environment. These simple steps will: • Allow for swift commencement of piling operations • Provide a safe environment for the piling crew and co-workers • Identify any and all hazards present on site • Clearly identify the working area. To prepare the site for piling, the main contractor should be advised to control the following elements: • Access to the site • The working platform • The services
request information sheet $
×

Risks Associated with Piling

F008
Having established that a project requires a piled foundation, it is crucial to assess the potential risks involved. While every site has its own particular risks, this quick and simple guide provides an overview for identifying the main considerations to enable control measures to be put in place in order to eliminate (or greatly reduce) identified risks.
request information sheet $
×

Choosing a Pile System

F007

Piling can be categorised into two main divisions:
1. REPLACEMENT piles are generally bored where the soil is excavated and replaced with concrete or grout.
2. DISPLACEMENT piles typically involve driving piles into the ground where the soil is displaced radially and vertically.

request information sheet $
×

Precast Concrete House Foundations

F002

Combining precast concrete piling, precast concrete pile caps and precast concrete ground beams, manufactured under controlled factory conditions.
Advantages include:

  • Improved Health & Safety
  • Greater speed of construction
  • Higher standards of quality and reliability
  • Greater predictability of costs and programme
  • Less disruptions to the construction process (not weather dependent)
  • Reduced environmental impact (no spoil on site or wasted materials)
  • Simpler construction process
  • Reduced reliance on expensive, scarce traditional trades
  • All delivered in one sub-contract package
request information sheet $
Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.